
Metropolitan Parking Deck
A full-deck recoat with wall-to-wall containment and masking that brightened a multi-level structure while the garage stayed operational.

Commercial epoxy flooring is a resin coating bonded to prepared concrete to resist abrasion, chemicals and tire traffic. Parking deck striping adds stall lines, arrows and safety markings in traffic paint. In Charlotte, Carolina Sky Painting grinds and repairs the slab, applies epoxy or polyaspartic systems, and stripes decks one level at a time.
Warehouse floors, stairwells, ramps and parking structures prepped, coated and striped in phases, so the facility keeps moving while the work gets done.
Coatings fail when the prep is skipped. Every scope below starts with the concrete, not the color.
Diamond grinding or shot blasting to open the slab so the coating bonds instead of peeling.
Cracks, spalls and control joints filled and leveled before the first coat goes down.
100% solids epoxy for warehouses, back-of-house areas and mechanical rooms.
Fast-curing, UV-stable topcoats that shorten downtime and hold their color.
Slip-resistant coatings on treads and landings, with walls and rails repainted to match.
Columns, ceilings and walls brightened level by level while the garage stays open.
Stall lines, directional arrows, stop bars and crosswalks in durable traffic paint.
Curbs, fire lanes, bollards and accessible parking spaces marked clearly and consistently.
A floor coating is only as good as the slab under it. These questions show whether a bidder plans to prep the concrete or just paint over it.
| What to check | What to ask | What Carolina Sky does |
|---|---|---|
| Surface prep | AskHow will the concrete be profiled before coating? | Carolina SkyMechanical prep by grinding or shot blasting. Acid washing alone is not a profile. |
| Moisture | AskWill the slab be checked for moisture first? | Carolina SkyWe check the slab and choose a system that suits what we find. |
| System, not product | AskWhat are the primer, build coat and topcoat? | Carolina SkyEach layer is named on the proposal with its purpose. |
| Downtime | AskWhen can foot and vehicle traffic return? | Carolina SkyReturn-to-service times are written into the schedule for every phase. |
| Traffic control | AskHow is the deck or floor kept in use during work? | Carolina SkyWe close one level or zone at a time with barricades and signage. |
| Layout | AskWho confirms the stall count and accessible spaces? | Carolina SkyThe striping layout is reviewed with you before any line is painted. |

A full-deck recoat with wall-to-wall containment and masking that brightened a multi-level structure while the garage stayed operational.

High-durability epoxy coatings on ramps and new safety striping for a commercial parking facility.

Epoxy coatings on treads and landings, durable wall paint and red pipe detailing in a high-traffic commercial stairwell.
Straight answers for property managers, owners and general contractors. Call or email if yours is not here.
Most floors take two to four working days: one for surface prep and repairs, one or two for the coating system, then cure time before traffic returns. Fast-cure polyaspartic systems can shorten that. Large floors are split into zones so part of the space stays in use.
Epoxy builds a thick, hard, chemical-resistant film and is the usual base coat. Polyaspartic cures much faster and resists UV yellowing, so it is often used as the topcoat or where downtime has to be short. Many commercial floors use both.
Yes. We close one level or section at a time, stripe it, let the paint cure and reopen it before moving on. Signage and barricades direct drivers around the closed area.
Almost always because of poor surface prep or moisture in the slab. Coating over smooth, sealed or damp concrete gives the epoxy nothing to bond to. Mechanical grinding or shot blasting and a moisture check before coating prevent most failures.
Each service has its own page with scope, a buyer's checklist and completed work in Charlotte.

Walkthrough, transparent scope, line-item quote. Most proposals come back within 48 hours. For multi-building portfolios, we'll acknowledge same day and turn a detailed package inside one week.